In September 2018 the seagoing tugboat Lamnalco Magpie, owned by Smit Lamnalco, spent almost 2 months at Odessos Shipyard undergoing class renewal with a variety of major repair works and maintenance.
Project info:
- Date of arrival: 24 September 2018
- Date of departure: 3 December 2018
- Vessel’s name: LAMNALCO MAGPIE
- Vessel’s type: seagoing tugboat
- Gross Tonnage: 1290
- Deadweight: 941 t
- Length x Breadth: 53 x 13,8 m
- Year built: 2008
Tasks performed for this project:
- Standard dry docking jobs
- Steel works
- Mechanical works
- Pipe renewals
- Electrical works
- Deck works

This is our first project from the Smit Lamnalco Fleet. The long extensive repair of Lamnalco Magpie began with standard drydock works – grit blasting, washing, painting program.
During her stay we encountered some challenges and thanks to our mutual eorts Lamnalco Magpie left our yard in an excellent condition.

TASK PERFORMED
- Plenty of tanks has been cleaned
- Hull Fenders Removal and Refit as access for hull treatment;
- Repair supporting bars and lugs
- Accommodation AC Systems and AC Condensing
Units overhaul:
- Vent System Axial Flow Fans inspection and overhaul
- Main Engines overhaul
- A huge amount of E-motors overhaul
- PS and SB Generators overhaul
- PS and SB Shaft Generators overhaul
- PS and SB Stern Thrusters overhaul, propeller blades repair
- Bow thruster overhaul
- Fwd. Tow Winch/Windlass Overhaul
- Aft. AHT Winch Overhaul
- Overhauling/maintenance hydraulic equipment, fabrication, and replacement hydraulic hoses
- Pipe renewals
- Cabins and sanitary spaces upgrading